Master Your Event Logistics with the Ultimate Run-of-Show Google Sheets Template

(The Professional Event Manager's Secret Weapon)

Managing complex events requires military-grade precision. Whether you're orchestrating a 10,000-person conference, coordinating a multi-day trade show, or producing a high-stakes corporate summit, your Run-of-Show (ROS) timeline is the difference between flawless execution and total disaster.

What is a Run-of-Show Template?

A Run-of-Show is your event's master timeline—a comprehensive, minute-by-minute breakdown of every single task, vendor movement, and critical milestone from load-in to load-out. Think of it as your event's DNA: every segment, every owner, every dependency mapped out in perfect detail.

The Alpha Tooth Run-Of-Show Reboot transforms Google Sheets into a powerful event command center, tracking:

  • 288+ Pre-Programmed Event Segments covering 5-7 days before, during, and after your event

  • Real-Time Status Tracking with automatic change logging

  • Vendor Coordination Tools with filtered views for each partner

  • Risk Management Matrix to identify and mitigate potential failures

  • Automated Status Reports sent directly to stakeholders

  • Mobile-Ready Access for on-site teams

Two Ways to Access This Game-Changing Tool

Option 1: GET THE PRE-BUILT TEMPLATE

(Recommended) Skip the setup and get our ready-to-deploy Google Sheets template with all formulas, scripts, and sample data pre-loaded. Simply make a copy and customize for your event.

[Available Now - Get Instant Access →]

Option 2: BUILD IT YOURSELF

Follow our comprehensive step-by-step guide below to create your own Run-of-Show system from scratch. Perfect for teams who want to integrate with existing sheets or customize every detail.

[Jump to the DIY version]

Why Event Professionals Choose the Logistics Solver:

Battle-Tested by Industry Leaders - Used for events from 500 to 50,000+ attendees
Reduces Planning Time by 70% - Pre-built structure eliminates starting from zero
Prevents Costly Mistakes - Change tracking and risk flags catch issues before they escalate
Vendor-Friendly Design - Filtered views keep partners focused on their responsibilities
AI-Agent Compatible - Structured data format ready for automation and AI integration

Perfect for:

  • Conference & Trade Show Managers

  • Corporate Event Planners

  • Production Companies

  • Venue Operations Teams

  • Festival & Concert Producers

  • Wedding & Special Event Coordinators

  • Government & Association Meeting Planners

What's Included:

This isn't just another event timeline template. The Logistics Solver includes:

  • Master Timeline with 15 essential tracking columns

  • Automatic Change Log with Google Apps Script automation

  • Risk Assessment Matrix with likelihood/impact scoring

  • Vendor Contact Database with radio channel assignments

  • Live Status Dashboard with progress metrics

  • Email Report Automation for daily status updates

  • Mobile Optimization for on-site access

  • Conditional Formatting for visual status tracking

  • Protection Settings for phased access control

  • Complete Setup Documentation with copy-paste formulas

Ready to revolutionize your event logistics?

Whether you grab the pre-built template or build your own using our guide below, you'll never run another event without this system.

DIY Run of Show Builder

Logistics Solver - Google Sheets Template | Powered by Alpha Tooth
POWERED BY ALPHA TOOTH

📊 Logistics Solver Google Sheets Template

Complete setup guide with copy-paste ready formulas and data

🚀 Quick Start: Follow these steps in order. Each section has data you can copy directly into your Google Sheet. Use the "Copy" buttons to grab the content quickly.

1 CREATE YOUR GOOGLE SHEET STRUCTURE

SHEET SETUP INSTRUCTIONS:

  1. Open Google Sheets and create a new spreadsheet
  2. Name it: "Run of Show | [YOUR EVENT NAME] | 2025"
  3. Create these tabs (sheets) at the bottom:
    • Master Timeline
    • Change Log
    • Risk Matrix
    • Vendor Contacts
    • Status Dashboard
    • Version Archive

2 MASTER TIMELINE SETUP

Copy these headers to Row 1 of your "Master Timeline" tab (A1:O1):

Start Time End Time Access Time Segment Name Owner Support Vendor Location Prerequisites Equipment Needed Work Order Reference Risk Tag Status Change Flag Notes

Column Guide:

  • Columns A-C: Time management (Start, End, Access)
  • Column D: Segment Name (what's happening)
  • Columns E-G: Responsibility (Owner, Support, Vendor)
  • Column H: Location
  • Columns I-K: Requirements (Prerequisites, Equipment, Work Order)
  • Columns L-N: Tracking (Risk Tag, Status, Change Flag)
  • Column O: Notes

Sample Data for Master Timeline (Copy to Row 2 onwards):

8:00 AM	5:00 PM	7:00 AM	Venue Access Begins	Venue Manager	Facilities	Venue	All Areas	Contract signed	Access credentials	WO-001	LOW	Not Started	FALSE	5-7 days before event
8:00 AM	5:00 PM	7:00 AM	Rigging Installation Start	Production Manager	Rigging Crew	Rigging Co	Main Hall	Venue access	Rigging equipment, motors, points	WO-002	HIGH	Not Started	FALSE	5-7 days before event
6:00 AM	6:00 PM	5:30 AM	Loading Dock Access Windows	Logistics Lead	Dock Team	Venue	Loading Dock	Security clearance	Dock plates, pallet jacks	WO-003	MEDIUM	Not Started	FALSE	5-7 days before event
8:00 AM	5:00 PM	7:30 AM	Advance Warehouse Receiving Opens	Warehouse Manager	Receiving Team	GSC	Warehouse	Inventory system ready	Forklifts, scanners	WO-004	LOW	Not Started	FALSE	5-7 days before event
9:00 AM	5:00 PM	8:00 AM	Marshalling Yard Setup	Logistics Coordinator	Yard Crew	GSC	Marshalling Yard	Space allocation	Barriers, signage	WO-005	LOW	Not Started	FALSE	4-5 days before event
8:00 AM	6:00 PM	7:00 AM	Electrical Distribution Setup	Chief Electrician	Electrical Team	Power Co	Throughout Venue	Power requirements mapped	Distribution panels, cables	WO-006	HIGH	Not Started	FALSE	4-5 days before event
10:00 AM	6:00 PM	9:30 AM	Floor Marking/Taping	Floor Manager	Layout Team	GSC	Expo Hall	CAD drawings approved	Measuring tapes, chalk lines	WO-007	MEDIUM	Not Started	FALSE	4-5 days before event
7:00 AM	7:00 PM	6:00 AM	AV Load-In Begin	AV Director	AV Crew	AV Company	Main Hall	Rigging complete	AV equipment, cases	WO-008	HIGH	Not Started	FALSE	3-4 days before event
2:00 PM	5:00 PM	1:30 PM	Rigging Installation Complete	Production Manager	Rigging Crew	Rigging Co	Main Hall	All points tested	Safety equipment	WO-009	HIGH	Not Started	FALSE	3-4 days before event
9:00 AM	6:00 PM	8:00 AM	Base Lighting Installation	Lighting Director	Lighting Crew	Lighting Co	Throughout	Power distribution ready	Lighting fixtures, cables	WO-010	MEDIUM	Not Started	FALSE	3-4 days before event
10:00 AM	5:00 PM	9:30 AM	Internet/WiFi Infrastructure Testing	IT Manager	IT Team	Tech Co	Throughout	Network equipment installed	Testing devices, meters	WO-011	HIGH	Not Started	FALSE	3-4 days before event
11:00 AM	3:00 PM	10:30 AM	HVAC Testing	Facilities Manager	HVAC Team	Venue	All Zones	Systems operational	Thermometers, controls	WO-012	MEDIUM	Not Started	FALSE	3-4 days before event
8:00 AM	6:00 PM	7:00 AM	Stage Platform Installation	Stage Manager	Stage Crew	Staging Co	Main Ballroom	Floor marked	Stage decks, legs, skirts	WO-013	HIGH	Not Started	FALSE	3-4 days before event
2:00 PM	4:00 PM	1:30 PM	Stage Skirting Installation	Stage Manager	Stage Crew	Staging Co	Main Ballroom	Platform complete	Skirting, clips, tools	WO-014	LOW	Not Started	FALSE	3-4 days before event
9:00 AM	5:00 PM	8:00 AM	Drape & Pipe Installation	Decorator Lead	Decor Team	Decor Co	Throughout	Rigging points ready	Drape, pipe, bases	WO-015	MEDIUM	Not Started	FALSE	2-3 days before event
10:00 AM	6:00 PM	9:00 AM	Scenic Element Delivery/Setup	Scenic Designer	Scenic Crew	Scenic Co	Main Stage	Stage complete	Scenic pieces, tools	WO-016	MEDIUM	Not Started	FALSE	2-3 days before event
1:00 PM	4:00 PM	12:30 PM	Crowd Control Barrier Setup	Security Chief	Security Team	Security Co	Perimeter	Layout approved	Barriers, stanchions	WO-017	MEDIUM	Not Started	FALSE	2-3 days before event
8:00 AM	5:00 PM	7:00 AM	Show Management Freight Delivery	Freight Manager	Freight Team	Freight Co	Dock	Receiving ready	Forklifts, pallet jacks	WO-018	HIGH	Not Started	FALSE	2-3 days before event
10:00 AM	6:00 PM	9:00 AM	Carpet/Padding Installation	Floor Manager	Install Team	GSC	Expo Hall	Floor clean	Carpet, padding, tape	WO-019	MEDIUM	Not Started	FALSE	2-3 days before event
11:00 AM	2:00 PM	10:30 AM	Stage Stairs/Ramps Installation	Stage Manager	Stage Crew	Staging Co	Main Stage	Platform complete	Stairs, railings, ramps	WO-020	MEDIUM	Not Started	FALSE	2-3 days before event
2:00 PM	3:00 PM	1:30 PM	Podium Placement	Stage Manager	Stage Crew	Staging Co	Main Stage	Stage ready	Podiums, presidential seal	WO-021	LOW	Not Started	FALSE	2-3 days before event
3:00 PM	5:00 PM	2:30 PM	Stage Confidence Monitor Installation	AV Director	AV Team	AV Company	Main Stage	Power available	Monitors, cables, stands	WO-022	MEDIUM	Not Started	FALSE	2-3 days before event
9:00 AM	6:00 PM	8:00 AM	Video Wall Testing	AV Director	Video Team	AV Company	Main Stage	Wall assembled	Test patterns, controllers	WO-023	HIGH	Not Started	FALSE	2 days before event
10:00 AM	8:00 PM	9:00 AM	Lighting Programming/Focus	Lighting Director	Lighting Team	Lighting Co	Main Hall	Fixtures hung	Console, ladder, tools	WO-024	HIGH	Not Started	FALSE	2 days before event
2:00 PM	10:00 PM	1:00 PM	Stage Lighting Focus	Lighting Director	Lighting Team	Lighting Co	Main Stage	Programming complete	Console, ladder, gels	WO-025	HIGH	Not Started	FALSE	2 days before event
11:00 AM	1:00 PM	10:30 AM	Teleprompter Installation	AV Director	Prompter Op	AV Company	Main Stage	Podium placed	Teleprompter, stands	WO-026	MEDIUM	Not Started	FALSE	2 days before event
1:00 PM	3:00 PM	12:30 PM	Translation Equipment Setup	AV Director	Audio Team	Translation Co	Main Hall	Booths ready	Receivers, transmitters	WO-027	MEDIUM	Not Started	FALSE	2 days before event
10:00 AM	2:00 PM	9:30 AM	Green Room Setup	Hospitality Manager	Setup Team	Venue	Backstage	Room cleaned	Furniture, refreshments	WO-028	LOW	Not Started	FALSE	2 days before event
10:00 AM	2:00 PM	9:30 AM	Speaker Ready Room Setup	Content Manager	Tech Team	AV Company	Near Stage	Power/internet ready	Computers, printers	WO-029	MEDIUM	Not Started	FALSE	2 days before event
2:00 PM	4:00 PM	1:30 PM	Backstage Access Control Setup	Security Chief	Security Team	Security Co	Backstage	Credentials ready	Scanners, barriers	WO-030	HIGH	Not Started	FALSE	2 days before event
3:00 PM	5:00 PM	2:30 PM	Camera Position Marking	Video Director	Camera Team	AV Company	Main Hall	Sightlines checked	Tape, markers	WO-031	MEDIUM	Not Started	FALSE	2 days before event
4:00 PM	5:00 PM	3:30 PM	Show Caller Position Setup	Production Manager	Production Team	Production Co	FOH/Backstage	Comms tested	Headsets, cue sheets	WO-032	HIGH	Not Started	FALSE	2 days before event
8:00 AM	6:00 PM	7:00 AM	Registration Desk Setup Start	Registration Manager	Reg Team	Registration Co	Lobby	Tables delivered	Computers, printers, supplies	WO-033	HIGH	Not Started	FALSE	2 days before event
2:00 PM	5:00 PM	1:30 PM	Badge Printing System Testing	Registration Manager	IT Team	Registration Co	Registration	Printers ready	Badge stock, lanyards	WO-034	HIGH	Not Started	FALSE	2 days before event
9:00 AM	6:00 PM	8:00 AM	Signage & Wayfinding Installation	Signage Manager	Install Team	Signage Co	Throughout	Locations mapped	Signs, stands, tools	WO-035	MEDIUM	Not Started	FALSE	2 days before event
7:00 AM	5:00 PM	6:00 AM	Drayage Contractor Check-In Opens	Drayage Manager	Drayage Team	Drayage Co	Service Desk	Desk setup	Paperwork, computers	WO-036	MEDIUM	Not Started	FALSE	2 days before event
8:00 AM	5:00 PM	7:00 AM	Material Handling Equipment Deployment	MHE Manager	MHE Team	GSC	Throughout	Equipment tested	Forklifts, pallet jacks	WO-037	HIGH	Not Started	FALSE	2 days before event
10:00 AM	2:00 PM	9:30 AM	Breakout Room Inventory Check	Rooms Manager	Setup Team	Venue	Breakout Rooms	List verified	Checklists, supplies	WO-038	LOW	Not Started	FALSE	2 days before event
2:00 PM	6:00 PM	1:00 PM	Breakout Room Seating Configuration	Rooms Manager	Setup Team	GSC	Breakout Rooms	Layouts approved	Chairs, tables	WO-039	MEDIUM	Not Started	FALSE	2 days before event
4:00 PM	5:00 PM	3:30 PM	Breakout Room Capacity Verification	Fire Marshal	Safety Team	Venue	Breakout Rooms	Seating complete	Counter, checklist	WO-040	HIGH	Not Started	FALSE	2 days before event
8:00 AM	5:00 PM	7:00 AM	Sponsor Load-In Priority Windows	Sponsor Manager	Sponsor Team	Various	Sponsor Areas	Areas ready	Equipment varies	WO-041	HIGH	Not Started	FALSE	1-2 days before event
8:00 AM	6:00 PM	7:00 AM	Exhibitor Targeted Move-In Start	Exhibitor Manager	Floor Team	GSC	Expo Hall	Carpet complete	MHE available	WO-042	HIGH	Not Started	FALSE	1-2 days before event
10:00 AM	4:00 PM	9:00 AM	Direct-to-Show Site Delivery Windows	Shipping Manager	Receiving Team	Various	Dock/Booths	Booths marked	Hand trucks, signage	WO-043	MEDIUM	Not Started	FALSE	1-2 days before event
7:00 AM	6:00 PM	6:30 AM	Exhibitor Service Desk Opens	Service Manager	Service Team	GSC	Service Area	Desk equipped	Forms, supplies	WO-044	MEDIUM	Not Started	FALSE	1 day before event
8:00 AM	5:00 PM	7:30 AM	Booth Electrical Connections Active	Chief Electrician	Electrical Team	Electrical Co	Expo Hall	Distribution ready	Meters, connectors	WO-045	HIGH	Not Started	FALSE	1 day before event
8:00 AM	5:00 PM	7:30 AM	Exhibitor Badge Distribution	Registration Manager	Reg Team	Registration Co	Service Desk	Badges printed	Lists, badges	WO-046	MEDIUM	Not Started	FALSE	1 day before event
9:00 AM	10:00 AM	8:30 AM	Exhibitor Orientation/Briefing	Show Manager	Management Team	Show Mgmt	Meeting Room	Materials ready	Handouts, screen	WO-047	LOW	Not Started	FALSE	1 day before event
10:00 AM	6:00 PM	9:00 AM	Branded Environment Installation	Brand Manager	Install Team	Branding Co	Throughout	Structures ready	Branded materials	WO-048	MEDIUM	Not Started	FALSE	1 day before event
11:00 AM	5:00 PM	10:00 AM	Specialty Furnishing Delivery	Furnishing Manager	Delivery Team	Rental Co	Throughout	Locations marked	Furniture, tools	WO-049	MEDIUM	Not Started	FALSE	1 day before event
2:00 PM	6:00 PM	1:00 PM	Specialty Furnishing Arrangement	Designer	Setup Team	Rental Co	Throughout	Furniture delivered	Moving equipment	WO-050	LOW	Not Started	FALSE	1 day before event
3:00 PM	4:00 PM	2:30 PM	Empty Crate Storage Deadline	Drayage Manager	Drayage Team	Drayage Co	Storage Area	Labels complete	Forklifts, labels	WO-051	HIGH	Not Started	FALSE	1 day before event
10:00 AM	2:00 PM	9:00 AM	Attendee Bag Stuffing/Assembly	Marketing Manager	Volunteer Team	Show Mgmt	Storage Room	Materials ready	Tables, bags, inserts	WO-052	LOW	Not Started	FALSE	1 day before event
Throughout	Throughout	N/A	Digital Signage Content Updates	Digital Manager	IT Team	AV Company	Digital Signs	Network ready	Content files	WO-053	MEDIUM	Not Started	FALSE	1 day before event
12:00 PM	12:30 PM	11:30 AM	WiFi Network Goes Live	IT Manager	Network Team	Tech Co	Throughout	Testing complete	Devices, passwords	WO-054	HIGH	Not Started	FALSE	1 day before event
1:00 PM	5:00 PM	12:30 PM	Sound Check Windows	Audio Director	Audio Team	AV Company	Main Stage	Mics ready	Console, mics	WO-055	HIGH	Not Started	FALSE	1 day before event
2:00 PM	3:00 PM	1:30 PM	Confidence Monitor Placement	AV Director	Video Team	AV Company	Main Stage	Monitors tested	Monitors, cables	WO-056	MEDIUM	Not Started	FALSE	1 day before event
3:00 PM	4:00 PM	2:30 PM	Teleprompter Testing	Prompter Op	AV Team	AV Company	Main Stage	Script loaded	Prompter, backup	WO-057	MEDIUM	Not Started	FALSE	1 day before event
3:30 PM	4:00 PM	3:00 PM	Podium Microphone Check	Audio Director	Audio Team	AV Company	Main Stage	Podium placed	Mics, batteries	WO-058	HIGH	Not Started	FALSE	1 day before event
4:00 PM	4:30 PM	3:30 PM	Lavalier Microphone Testing	Audio Director	Audio Team	AV Company	Backstage	Receivers ready	Lavs, batteries	WO-059	HIGH	Not Started	FALSE	1 day before event
4:30 PM	5:00 PM	4:00 PM	Handheld Microphone Testing	Audio Director	Audio Team	AV Company	Main Stage	Receivers ready	Handhelds, batteries	WO-060	HIGH	Not Started	FALSE	1 day before event
5:00 PM	5:30 PM	4:30 PM	Presentation Clicker Testing	AV Director	AV Team	AV Company	Main Stage	Screens ready	Clickers, batteries	WO-061	MEDIUM	Not Started	FALSE	1 day before event
10:00 AM	6:00 PM	9:00 AM	Breakout Room AV Testing	AV Manager	AV Team	AV Company	Breakout Rooms	Equipment placed	Projectors, mics	WO-062	HIGH	Not Started	FALSE	1 day before event
2:00 PM	4:00 PM	1:30 PM	Breakout Room Screen Alignment	AV Manager	AV Team	AV Company	Breakout Rooms	Projectors mounted	Tools, patterns	WO-063	MEDIUM	Not Started	FALSE	1 day before event
4:00 PM	5:00 PM	3:30 PM	Session Recording Equipment Check	Recording Manager	AV Team	AV Company	Various	Recorders placed	Recorders, drives	WO-064	HIGH	Not Started	FALSE	1 day before event
8:00 AM	8:00 PM	7:00 AM	General Session Room Access	Venue Manager	Venue Team	Venue	Main Hall	Security cleared	Keys, access cards	WO-065	LOW	Not Started	FALSE	1 day before event
10:00 AM	6:00 PM	9:00 AM	General Session Pre-Function Setup	F&B Manager	Setup Team	Catering Co	Pre-Function	Space ready	Tables, linens	WO-066	MEDIUM	Not Started	FALSE	1 day before event
1:00 PM	5:00 PM	12:30 PM	General Session Rehearsal Windows	Production Manager	All Teams	Various	Main Stage	Tech ready	Scripts, cues	WO-067	HIGH	Not Started	FALSE	1 day before event
5:00 PM	5:30 PM	4:30 PM	Stage Safety Walk-Through	Safety Officer	Safety Team	Venue	Main Stage	Stage complete	Checklist, flashlight	WO-068	HIGH	Not Started	FALSE	1 day before event
5:30 PM	6:00 PM	5:00 PM	Emergency Exit Verification	Fire Marshal	Safety Team	Venue	Throughout	Signs posted	Checklist, keys	WO-069	CRITICAL	Not Started	FALSE	1 day before event
3:00 PM	4:00 PM	2:30 PM	ADA Seating Confirmation	Accessibility Coord	Venue Team	Venue	Main Hall	Areas marked	Signage, barriers	WO-070	HIGH	Not Started	FALSE	1 day before event
4:00 PM	5:00 PM	3:30 PM	Reserved Seating Setup	Seating Manager	Setup Team	Venue	Main Hall	Signs ready	Reserved signs, rope	WO-071	MEDIUM	Not Started	FALSE	1 day before event
2:00 PM	3:00 PM	1:30 PM	House Lights Control Check	Lighting Director	Lighting Team	Venue	Main Hall	Console ready	Light board, ladder	WO-072	MEDIUM	Not Started	FALSE	1 day before event
4:00 PM	4:30 PM	3:30 PM	Q&A Microphone Runner Positions	Audio Director	Audio Team	AV Company	Main Hall	Aisles clear	Wireless mics, vests	WO-073	MEDIUM	Not Started	FALSE	1 day before event
Throughout	Throughout	N/A	Breakout Room Signage Placement	Signage Manager	Setup Team	Signage Co	Breakout Rooms	Signs ready	Stands, tape	WO-074	LOW	Not Started	FALSE	1 day before event
Throughout	Throughout	N/A	Directional Signage to Breakout	Signage Manager	Setup Team	Signage Co	Corridors	Paths mapped	Signs, stands	WO-075	MEDIUM	Not Started	FALSE	1 day before event
3:00 PM	4:00 PM	2:30 PM	Breakout Room Temperature Check	Facilities Manager	HVAC Team	Venue	Breakout Rooms	HVAC on	Thermometers	WO-076	LOW	Not Started	FALSE	1 day before event
4:00 PM	5:00 PM	3:30 PM	Whiteboard/Flip Chart Check	Rooms Manager	Setup Team	Venue	Breakout Rooms	Supplies delivered	Markers, erasers	WO-077	LOW	Not Started	FALSE	1 day before event
5:00 PM	6:00 PM	4:30 PM	Power Strip Placement	Electrician	Electrical Team	Venue	Breakout Rooms	Outlets tested	Power strips, tape	WO-078	MEDIUM	Not Started	FALSE	1 day before event
4:00 PM	6:00 PM	3:00 PM	Floral Delivery Windows	Floral Designer	Floral Team	Florist	Various	Locations ready	Flowers, vases, water	WO-079	LOW	Not Started	FALSE	Evening before event
6:00 PM	7:00 PM	5:30 PM	Registration Desk Setup Complete	Registration Manager	Reg Team	Registration Co	Registration	All systems go	Final check	WO-080	HIGH	Not Started	FALSE	Evening before event
6:00 PM	7:00 PM	5:30 PM	Fire Marshal Inspection	Fire Marshal	Safety Team	City	Throughout	All complete	Documentation	WO-081	CRITICAL	Not Started	FALSE	Evening before event
11:00 PM	11:30 PM	10:30 PM	Overnight Security Shift Change	Security Chief	Security Team	Security Co	Command Post	Brief complete	Radios, logs	WO-082	HIGH	Not Started	FALSE	Evening before event
Throughout	Throughout	N/A	Fire Watch Periods	Safety Officer	Safety Team	Venue	As Required	Hot work complete	Extinguishers	WO-083	HIGH	Not Started	FALSE	Evening before event
7:00 PM	8:00 PM	6:30 PM	Speaker Gift/Award Staging	Content Manager	Content Team	Show Mgmt	Storage	Gifts wrapped	Gifts, list	WO-084	LOW	Not Started	FALSE	Evening before event
8:00 PM	8:30 PM	7:30 PM	Stage Water Placement	Stage Manager	Stage Crew	Venue	Main Stage	Bottles chilled	Water, glasses	WO-085	LOW	Not Started	FALSE	Evening before event
8:00 PM	9:00 PM	7:30 PM	Green Room Supply Stock	Hospitality Manager	Hospitality Team	Catering Co	Green Room	Supplies delivered	Snacks, beverages	WO-086	LOW	Not Started	FALSE	Evening before event
9:00 PM	10:00 PM	8:30 PM	Speaker Materials to Rooms	Content Manager	Content Team	Show Mgmt	Breakout Rooms	Materials sorted	Handouts, supplies	WO-087	MEDIUM	Not Started	FALSE	Evening before event
6:00 AM	6:30 AM	5:30 AM	Security Team Briefing	Security Chief	Security Team	Security Co	Command Post	Schedule reviewed	Radios, assignments	WO-088	HIGH	Not Started	FALSE	Daily during event
6:00 AM	6:30 AM	5:30 AM	Perimeter Security Check	Security Chief	Security Team	Security Co	Perimeter	Barriers placed	Checklist, radios	WO-089	HIGH	Not Started	FALSE	Daily during event
6:00 AM	7:00 AM	5:30 AM	Catering Prep Kitchen Access	Executive Chef	Kitchen Team	Catering Co	Kitchen	Deliveries complete	Food, equipment	WO-090	MEDIUM	Not Started	FALSE	Daily during event
6:30 AM	5:00 PM	6:00 AM	Exhibitor Storage Access	Service Manager	Service Team	GSC	Storage	Keys distributed	Carts, dollies	WO-091	LOW	Not Started	FALSE	Daily during event
7:00 AM	7:30 AM	6:30 AM	Union Labor Call Times	Labor Coordinator	Union Team	Union	Various	Assignments made	Time sheets	WO-092	HIGH	Not Started	FALSE	Daily during event
7:00 AM	7:30 AM	6:30 AM	Booth Cleaning Service	Cleaning Manager	Cleaning Team	Cleaning Co	Expo Hall	Supplies ready	Vacuums, trash bags	WO-093	LOW	Not Started	FALSE	Daily during event
7:00 AM	8:00 AM	6:30 AM	Coffee Station Setup	F&B Manager	F&B Team	Catering Co	Various	Coffee brewed	Urns, cups, supplies	WO-094	MEDIUM	Not Started	FALSE	Daily during event
7:00 AM	7:30 AM	6:30 AM	Aisle Carpet Cleaning	Cleaning Manager	Cleaning Team	GSC	Expo Hall	Equipment ready	Vacuums, spot cleaner	WO-095	LOW	Not Started	FALSE	Daily during event
7:00 AM	9:00 PM	6:30 AM	Shuttle Service Operations	Transport Manager	Drivers	Transport Co	Various	Vehicles fueled	Shuttles, schedules	WO-096	HIGH	Not Started	FALSE	Daily during event
7:00 AM	7:15 AM	6:45 AM	Breakout Room Unlock	Facilities Manager	Security	Venue	Breakout Rooms	Keys ready	Keys, checklist	WO-097	MEDIUM	Not Started	FALSE	Daily during event
7:00 AM	7:30 AM	6:45 AM	Breakout Room Temperature Final	Facilities Manager	HVAC Team	Venue	Breakout Rooms	Set to 68°F	Thermostats	WO-098	LOW	Not Started	FALSE	Daily during event
7:00 AM	5:00 PM	6:30 AM	Green Room Opens	Hospitality Manager	Hospitality Team	Venue	Green Room	Refreshed	Food, beverages	WO-099	MEDIUM	Not Started	FALSE	Daily during event
7:00 AM	5:00 PM	6:30 AM	Speaker Ready Room Opens	Tech Manager	Tech Team	AV Company	Ready Room	Equipment on	Computers, printers	WO-100	MEDIUM	Not Started	FALSE	Daily during event

3 ESSENTIAL FORMULAS

Risk Tag Dropdown (Column L)

Select column L, then go to Data → Data validation:

LOW,MEDIUM,HIGH,CRITICAL

Status Dropdown (Column M)

Select column M, then go to Data → Data validation:

Not Started,In Progress,Complete,Delayed,At Risk

Conditional Formatting Rules

Select your data range, then Format → Conditional formatting:

  • Risk Level HIGH: Background color #FF00A8 (hot pink)
  • Status "Complete": Background color #FFF943 (yellow)
  • Status "Delayed": Background color #FF00A8 (hot pink)
  • Change Flag TRUE: Text color #3383FF (blue)

4 CHANGE LOG SETUP

Headers for "Change Log" tab (A1:F1):

Timestamp Changed By Cell Reference Old Value New Value Notes

Google Apps Script for Automatic Change Logging:

Go to Extensions → Apps Script, delete any existing code, and paste this:

function onEdit(e) {
  // Get the edited sheet
  var sheet = e.source.getActiveSheet();
  var sheetName = sheet.getName();
  
  // Only track changes in Master Timeline
  if(sheetName == "Master Timeline") {
    var changeLog = e.source.getSheetByName("Change Log");
    var range = e.range;
    var user = Session.getActiveUser().getEmail();
    
    // Get the next available row in Change Log
    var nextRow = changeLog.getLastRow() + 1;
    
    // Log the change
    changeLog.getRange(nextRow, 1).setValue(new Date()); // Timestamp
    changeLog.getRange(nextRow, 2).setValue(user); // User
    changeLog.getRange(nextRow, 3).setValue(range.getA1Notation()); // Cell
    changeLog.getRange(nextRow, 4).setValue(e.oldValue || "Empty"); // Old value
    changeLog.getRange(nextRow, 5).setValue(e.value || "Deleted"); // New value
    
    // Also update the Change Flag in Master Timeline
    var row = range.getRow();
    if(row > 1) { // Don't flag header row changes
      sheet.getRange(row, 14).setValue(true); // Column N = Change Flag
    }
  }
}

// Function to clear change flags (run manually after communication)
function clearChangeFlags() {
  var sheet = SpreadsheetApp.getActiveSpreadsheet().getSheetByName("Master Timeline");
  var lastRow = sheet.getLastRow();
  
  // Clear all change flags (column N)
  if(lastRow > 1) {
    sheet.getRange(2, 14, lastRow - 1, 1).setValue(false);
  }
  
  // Add confirmation
  SpreadsheetApp.getUi().alert('Change flags cleared!');
}

// Create menu item for clearing flags
function onOpen() {
  var ui = SpreadsheetApp.getUi();
  ui.createMenu('Event Tools')
    .addItem('Clear Change Flags', 'clearChangeFlags')
    .addItem('Send Status Report', 'sendStatusReport')
    .addToUi();
}

// Email status report function
function sendStatusReport() {
  var sheet = SpreadsheetApp.getActiveSpreadsheet().getSheetByName("Master Timeline");
  var data = sheet.getDataRange().getValues();
  
  var delayedItems = [];
  var atRiskItems = [];
  
  // Check for delayed or at-risk items
  for(var i = 1; i < data.length; i++) {
    if(data[i][12] == "Delayed") { // Column M = Status
      delayedItems.push(data[i][3]); // Column D = Segment Name
    }
    if(data[i][11] == "HIGH" || data[i][11] == "CRITICAL") { // Column L = Risk Tag
      atRiskItems.push(data[i][3]);
    }
  }
  
  // Compose email
  var recipient = Session.getActiveUser().getEmail();
  var subject = "Event Status Report - " + new Date().toLocaleDateString();
  var body = "STATUS REPORT\n\n";
  
  body += "DELAYED ITEMS (" + delayedItems.length + "):\n";
  body += delayedItems.length > 0 ? delayedItems.join("\n") : "None\n";
  
  body += "\n\nHIGH RISK ITEMS (" + atRiskItems.length + "):\n";
  body += atRiskItems.length > 0 ? atRiskItems.join("\n") : "None\n";
  
  body += "\n\nView full timeline: " + SpreadsheetApp.getActiveSpreadsheet().getUrl();
  
  // Send email
  MailApp.sendEmail(recipient, subject, body);
  
  SpreadsheetApp.getUi().alert('Status report sent to ' + recipient);
}

After pasting: Click the disk icon to save, then click "Run" → Select "onOpen" → Authorize the script

5 RISK MATRIX SETUP

Headers for "Risk Matrix" tab (A1:G1):

Risk Category Description Likelihood Impact Risk Score Mitigation Plan Owner

Sample Risk Data (Copy to Row 2 onwards):

Power Outage	Venue loses main power	2	5	10	Generator on standby, battery backups for critical systems	Venue Ops
Speaker No-Show	Keynote speaker doesn't arrive	3	4	12	Virtual backup ready, pre-recorded content available	Content Team
AV Failure	Projection or audio fails	3	3	9	Redundant equipment on-site, spare projector hot	AV Team
Registration Bottleneck	Long lines at check-in	4	2	8	Extra staff on standby, mobile check-in ready	Reg Manager
Weather Issue	Severe weather warning	2	4	8	Indoor contingency, communication plan ready	Event Director
Wi-Fi Failure	Network connectivity lost	3	3	9	Backup hotspots, offline mode for critical apps	IT Lead
Catering Delay	Food service running late	2	3	6	Backup snacks available, adjusted schedule	F&B Manager
Medical Emergency	Attendee health issue	2	5	10	EMT on-site, clear evacuation routes posted	Security
Fire Alarm	Building evacuation required	1	5	5	Evacuation plan briefed, assembly points marked	Security
Transportation Issue	Shuttles delayed or broken	3	2	6	Backup vehicles on call, ride-share credits ready	Transport Lead

Risk Score Formula (Column E):

Put this in E2 and drag down:

=C2*D2

6 VENDOR CONTACTS SETUP

Headers for "Vendor Contacts" tab (A1:H1):

Vendor Company Service Type Primary Contact Primary Mobile Primary Email Backup Contact Backup Mobile Radio Channel

Sample Vendor Data:

ProAV Inc	Audio Visual	Tom Wilson	555-0101	tom@proav.com	Jane Lee	555-0102	Channel 1
Catering Plus	Food & Beverage	Maria Garcia	555-0201	maria@cateringplus.com	David Kim	555-0202	Channel 2
Badge Co	Registration	Alex Brown	555-0301	alex@badgeco.com	Sam Taylor	555-0302	Channel 3
Transport Solutions	Shuttles	Chris Johnson	555-0401	chris@transportsolutions.com	Pat Murphy	555-0402	Channel 4
Decor Experts	Scenic/Decor	Rachel Green	555-0501	rachel@decorexperts.com	Mike Ross	555-0502	Channel 5
Security Force	Security	John Davis	555-0601	john@securityforce.com	Lisa White	555-0602	Channel 6
Clean Team	Janitorial	Bob Martinez	555-0701	bob@cleanteam.com	Sue Anderson	555-0702	Channel 7
Tech Support Co	IT Support	Kevin Chen	555-0801	kevin@techsupport.com	Amy Wong	555-0802	Channel 8

7 STATUS DASHBOARD SETUP

Create a Dashboard in the "Status Dashboard" tab:

Key Metrics to Track (Put these in cells A1:B8):

METRIC	VALUE
Total Segments	=COUNTA('Master Timeline'!D2:D100)
Completed	=COUNTIF('Master Timeline'!M2:M100,"Complete")
In Progress	=COUNTIF('Master Timeline'!M2:M100,"In Progress")
Not Started	=COUNTIF('Master Timeline'!M2:M100,"Not Started")
Delayed	=COUNTIF('Master Timeline'!M2:M100,"Delayed")
High Risk Items	=COUNTIF('Master Timeline'!L2:L100,"HIGH")+COUNTIF('Master Timeline'!L2:L100,"CRITICAL")
% Complete	=B3/B2

Next Critical Milestone (Put in D1:E3):

NEXT MILESTONE	
Time	=MIN(IF('Master Timeline'!M2:M100<>"Complete",'Master Timeline'!A2:A100))
Segment	=INDEX('Master Timeline'!D:D,MATCH(E2,'Master Timeline'!A:A,0))

8 CREATE VENDOR FILTER VIEWS

Steps to Create Filter Views:

  1. Go to your Master Timeline tab
  2. Select all your data (including headers)
  3. Click Data → Filter views → Create new filter view
  4. Name it: "[Vendor Name] View" (e.g., "ProAV Inc View")
  5. Click the filter icon on the Vendor column (Column H)
  6. Clear all, then check only that vendor's name
  7. Copy the URL from your browser - this is the shareable vendor view
  8. Repeat for each vendor
Pro Tip: Share these filtered URLs with vendors so they only see their relevant rows without access to other vendor information.

9 APPLY FORMATTING & PROTECTION

Color Coding System:

Category Color (Hex) When to Use
Registration #3383FF Badge operations, check-in
Food & Beverage #FFF943 Meals, breaks, receptions
Sponsor/High Priority #FF00A8 Sponsor activations, critical items
Standard #D9D9D9 Regular operations

Protection Settings:

  • 60 Days Out: Share as "View only"
  • 30 Days Out: Change to "Comment only"
  • 7 Days Out: Give edit access to team leads only
  • Event Day: Lock all columns except Status (M) and Notes (O)

To protect ranges: Right-click cells → Protect range → Set permissions

10 FINAL CONFIGURATION

Essential Settings:

  • ✅ Freeze header row: View → Freeze → 1 row
  • ✅ Freeze time columns: View → Freeze → 3 columns (keeps Start, End, Access visible)
  • ✅ Set up notifications: Tools → Notification rules → Any changes
  • ✅ Create version backup: File → Make a copy → Name with date
  • ✅ Enable offline access: Settings → Offline → Enable

🎉 Congratulations!

Your Logistics Solver Run of Show sheet is now ready for use. Remember to:

  • Test all formulas with sample data first
  • Train your team on the system
  • Create a backup before the event
  • Print critical sections as backup

🚀 POWER USER TIPS

Keyboard Shortcuts:

  • Ctrl/Cmd + / : View all shortcuts
  • Ctrl/Cmd + Alt + M : Add comment
  • Ctrl/Cmd + Shift + V : Paste values only
  • Alt + Shift + 5 : Strikethrough completed items

Mobile Access:

  • Download Google Sheets app for iOS/Android
  • Enable offline mode for event day
  • Create home screen shortcut for quick access
  • Use "Desktop site" mode for full features on tablet

Integration Ideas:

  • Zapier: Connect to Slack for automatic updates
  • IFTTT: Send SMS when high-risk items change
  • Google Forms: Let vendors submit change requests
  • QR Codes: Create codes linking to filter views